Sowerby Bridge Leisure Centre.
Shanco secured the Bulk Earthworks and Groundworks package on the new Sowerby Bridge Leisure Centre in 2009.
Project Details
- Location: Sowerby Bridge, West Yorkshire.
- Date: 2009 – 2010
- Value: £650k
- Client: Willmott Dixon
- Sector: Leisure
Tasks Undertaken & Services Provided
- Bulk Earthworks and Demolition.
- Temporary dam design and installation.
- Construction of Gabion Basket retaining wall to river.
- Piling Mat formation.
- Pile Cropping.
- Reinforced concrete ground beams and bases.
- Internal and External Drainage Installation.
- Swimming Pool Construction
- All external paving works.
- Section 278 works.



